







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Summerlin
If you’re in Summerlin and thinking about an addition, a casita, or converting a garage into living space, the honest first question is usually whether you can stay in the house you already love without moving to a single-level rental across town. Home additions in Summerlin typically run $45,000 – $130,000, and full ADU construction lands between $90,000 and $220,000. But a lot of what our Summerlin neighbors actually need – a safe shower, a doorway you can walk through without turning sideways, a guest space for a parent – can happen inside the existing walls for far less.
We know this community. The villages, the CC&Rs, the Summerlin Council review process, the caliche under your footing. Call (855) 596-7029 and we’ll talk through what your house will and won’t allow.
Why Barrett & Sons Construction Paradise Is Summerlin’s Preferred Home Additions & ADU Company

Barrett & Sons is owner-operated, and Tom Barrett’s sons run the crews. That matters in a place like Summerlin, where an addition isn’t just a build – it’s a build that has to clear a village architectural review board before a single wall goes up. We’ve spent years learning how The Ridges, Red Rock Country Club, and the 55+ villages of Sun City Summerlin handle submittals, and we don’t start framing until the palette is approved.
Our technicians have up to 28 years of experience, and every eligible job gets permits pulled and inspections signed. If you’ve already been told by another contractor that permits were optional, that’s the first thing we’ll fix. Every scope, every allowance, and every price change arrives as a written change order before work moves – because an allowance that isn’t on paper is a surprise waiting for a date. Calls are answered by a live person, 24 hours a day, and the 90-Day Done Right Promise is written on every contract.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Summerlin
ADU Design & Permitting
Summerlin’s dual gate – the building permit and the village ARC color-and-material submittal – is where most ADU projects get stuck. We sequence both from day one, so your stucco tone, roof pitch, and window style match the original tract palette instead of getting reworked after framing. Our Home Additions & ADU team handles the design, the submittals, and the inspection sign-off.

Garage Conversion ADU
A garage conversion in Summerlin runs $30,000 – $80,000 and is often the fastest path to a legal second living space. Because the footprint doesn’t change, you’re typically not triggering exterior architectural review – just the interior permit work for egress, insulation, and utilities. Great option for aging parents who need to be close but not underfoot.

New Detached ADU
Detached ADUs from $90,000 to $220,000 make sense when a family wants real separation – or rental income. On Summerlin’s engineered desert lots you’ll usually hit caliche during footing excavation, so we budget rock-breaking into the draw schedule up front instead of discovering it on day nine. Mediterranean and Southwestern style compliance is non-negotiable here.

Junior ADU & Interior Conversion
This is the work we do most in the 55+ villages. A junior ADU or interior conversion adds living space without adding exterior square footage, which keeps you clear of the ARC palette gate entirely. Zero-threshold showers, blocking for grab bars, widened openings where walls aren’t load-bearing – all inside the existing footprint. We also handle room additions and second-story work when the lot and the village rules allow it.
Trusted Brands We Service in Summerlin
When an addition or conversion touches a kitchen or bath, the cabinet and countertop brands matter. We install KraftMaid and Wellborn cabinetry and set Cambria and Silestone quartz, and we don’t claim to stock any of it locally – materials are ordered per job and scheduled to your timeline. The advantage is that these are brands you can look up and compare, not mystery products off an unmarked trailer. Premium brands across every trade we touch, backed by the 90-Day Done Right Promise.
See the difference
Before
After
Before
After
Before
AfterCommon Home Additions & ADU Problems We See in Summerlin Homes
- Building before the ARC approves. We regularly see casitas and detached ADUs framed up before the village submittal cleared – then the palette gets reworked after the walls are already standing. Sequence the review first, always.
- Assuming a bathroom retrofit needs no permit. Moving a drain or altering a load-bearing opening requires inspection sign-off in Summerlin. A shower-and-doorway retrofit that “feels finish-only” often isn’t.
- Smooth tile in a walk-in shower. Polished or smooth surfaces on the shower floor and single-level routes are a genuine slip hazard for 55+ residents. Slip-rated surfaces aren’t a luxury here – they’re the point.
- Caliche surprise. Summerlin’s lots sit on engineered desert terrain with hard caliche layers. Footing and utility excavation routinely hits rock that needs specialized breaking, and that cost belongs in the budget from the start.
Pricing for Home Additions & ADU in Summerlin, NV
Real numbers, not “it depends.” A typical Summerlin home addition runs $45,000 – $130,000 depending on footprint and whether you’re adding a second story. Detached ADU construction runs $90,000 – $220,000; garage conversions run $30,000 – $80,000. If your goal is aging in place inside the existing house, walk-in shower installation is $4,500 – $12,000, tub-to-shower conversion is $3,500 – $10,000, and a full bathroom remodel runs $9,000 – $28,000. The lower end of each range reflects permit-light interior work; the higher end reflects structural changes, ARC-driven material upgrades, and rock excavation. Call (855) 596-7029 for a free estimate in writing.
| Service | Summerlin Price Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Tub-to-Shower Conversion | $3,500 – $10,000 |
| Bathroom Remodel | $9,000 – $28,000 |
We Also Serve Cities Near Summerlin
Our crews work across the west valley and beyond – Spring Valley, Las Vegas, Winchester, and Paradise are all within reach. If you’re looking at Home Additions & ADU in Summerlin or the surrounding areas, the same permit discipline and written change orders apply. Call (855) 596-7029.
Serving Summerlin, NV – Our Local Coverage Area
We serve Summerlin and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Summerlin

Usually not, if the footprint stays inside the existing walls. The ARC palette gate opens when exterior color or materials change – which an interior bathroom retrofit doesn’t trigger. Relocating a drain or altering a load-bearing wall still requires a building permit and inspection, though. Call (855) 596-7029 for a free walkthrough.
Walk-in shower installation runs $4,500 – $12,000 and tub-to-shower conversion runs $3,500 – $10,000. A finish-only swap often needs no permit; moving the drain or changing framing does. We’ll tell you which path your bathroom is on before demolition starts.
Yes, and it’s often the cheapest and fastest path – $30,000 – $80,000 versus $90,000 – $220,000 for a detached build. Because the footprint doesn’t change, exterior review usually isn’t triggered, though 55+ communities may have occupancy rules worth checking with your village association. Call (855) 596-7029 for an honest scope.
Caliche is hard, cemented desert soil that routinely stops a trencher and demands specialized rock breaking during footing and utility excavation. We budget for it up front rather than discovering it mid-project. It’s one of the reasons Summerlin additions price higher than the same square footage on softer ground.
Scope of work, allowances, the change order process, permit responsibility, ARC submittal timeline, and the 90-Day Done Right Promise. All of it in writing, signed before demolition. Call (855) 596-7029 and we’ll walk you through the paperwork line by line.
Written by the team at Barrett & Sons Construction Paradise.












