







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterBathroom Remodel Cost in Paradise, NV: What a 1990s Tract Bathroom Really Needs
Bathroom remodel costs in Paradise typically run $9,000-$28,000, and small bathrooms land closer to $5,000-$12,000. That range is higher than the national number you’ll find online because most Paradise bathrooms sit inside homes built in the 1990s and 2000s, and those original fiberglass pan-and-surround assemblies are at the end of their 15-20 year life. A real budget here starts with tear-out, not resurfacing. Call (855) 596-7029 for a free estimate, and a live person picks up.
Here’s the problem we see in Paradise almost every week. A homeowner gets a quote that looks reasonable, the contractor tiles right over the old fiberglass surround, and four years later the tile is cracking and the grout has separated from the wall. That’s not a finish problem. The pan underneath was already finished when the overlay went on.

Tiling Over the Old Surround Is a Four-Year Fix in Paradise
Most of the housing stock around here was built between 1990 and 2010, and it was built fast for a hot, dry climate. The standard bathroom spec was a fiberglass pan with a fiberglass surround screwed to the studs. Those are rated for 15 to 20 years. If your house went up in 1998, that pan has been on borrowed time since the first Trump administration, and no amount of new tile on top resets the clock.
So when a Paradise homeowner asks us for “a bathroom remodel cost,” the first thing we do is check what’s actually behind the wall. Three things come up again and again:
- The fiberglass surround hides a pan that’s flexing underfoot, and flex means the drain seal is already compromised.
- The drywall behind the surround was never a waterproof backer. It’s paper-faced gypsum, and once the fiberglass seam fails, it takes on water quietly.
- In a handful of cases the subfloor under the pan has soft spots from slow leaks, which adds a floor-repair line before the new pan goes in.
That’s the line most estimates skip. A resurface quote looks cheaper because it doesn’t include demo, doesn’t include waterproofing, and doesn’t include a new subfloor if one’s needed. The full tear-out is the honest number.
Why Full Waterproofing Costs More Up Front and Less in the End
We install a continuous waterproofing membrane behind the tile, not just cement board. That’s a real cost difference up front – membrane and the labor to install and inspect it correctly add to the job. But it’s also the difference between a bathroom that lasts ten years and one that fails in four.
Paradise makes this matter more than a coastal market does. Desert humidity swings hard: months of single-digit relative humidity, then monsoon weeks where the air is thick. Caulk joints and grout lines expand and contract with every swing. A membrane spreads that movement across a continuous surface. Cement board with a rolled-on coating in the corners is where the failures start, and we’ve pulled out plenty of them.
What a Bathroom Remodel Costs in Paradise
Here’s the line-item range we work from. These are the numbers a homeowner in Paradise should expect to see written into a scope before demo day, and they’re the numbers we hold to on the invoice.
| Item | Typical Range |
|---|---|
| Full bathroom remodel (tear-out, new pan or shower, tile, fixtures) | $9,000-$28,000 |
| Small bathroom remodel | $5,000-$12,000 |
| Walk-in shower installation | $4,500-$12,000 |
| Tub-to-shower conversion | $3,500-$10,000 |
| Shower replacement | $3,000-$8,500 |
| Bathroom vanity installation | $800-$3,000 |
The spread inside each row comes down to fixture level, tile selection, and how much framing or subfloor repair shows up after demo. Every one of those gets settled before we start, not after.

Every Allowance Is on Paper Before the First Hammer Swings
This is where a lot of Paradise homeowners got burned before they called us. An estimate that says “vanity: included” without a number isn’t an estimate. It’s a placeholder. The vanity you actually pick might land three times what the last guy had in mind, and that difference shows up at the end as an adjustment nobody agreed to.
So we write it down. Vanity, faucet, shower valve, tile, lighting, exhaust fan – each one gets an allowance number in the scope before demo. If you want to upgrade mid-job, that’s fine, but the price change arrives as a written change order first, signed before the work happens. An allowance that isn’t on paper is a surprise waiting for a date, and we’d rather you never meet that surprise.
Barrett & Sons Construction Paradise quotes every bathroom this way. The number you approve is the number on your invoice.
The Electrical Problem Hiding Behind Your Vanity Mirror
Most 1990s bathrooms in Paradise ran a single 20-amp circuit for the vanity lights, the outlets, and the exhaust fan. That was fine when the load was three bulbs and a hair dryer. It’s not what the NEC calls for now, and it’s why we open the panel as part of any full remodel that touches the rough-in.
Bringing that circuit up to current code is a real line item, and it’s worth doing while the walls are open. Drywall back up, add a dedicated circuit later, and you’re paying twice. We pull the electrical and plumbing permits ourselves whenever a bathroom remodel touches the rough-in, and that matters more than it sounds in Paradise, where all of it is Clark County jurisdiction – there’s no city hall here because Paradise is unincorporated. The county inspector verifies the shower pan liner and the GFCI protection. That signed inspection card is what protects you at resale, and it’s the reason the permit inspector works for you, not for us.
For the full scope of what we handle, the Bathroom Remodeling page walks through the whole build, and the Bathroom Remodeling in Paradise page covers the local side.
Common Scenarios We See in Paradise Bathrooms
Original surround, no leaks yet, first remodel
Full tear-out, membrane, new pan or a tub-to-shower conversion in the $3,500-$10,000 band. This is the majority of what we do here.
Prior overlay failing in four years
We pull the overlay, then pull what’s under it, sometimes back to studs. The cost lands inside the standard $9,000-$28,000 range but there’s no fixture budget to save on – the money goes to demo and waterproofing.
Soft floor near the drain
Slow leaks show up as a spongy spot you feel through the tile. Catch it early and it’s a subfloor repair line. Ignore it and you’re looking at a floor structure fix, which can push toward the top of the range or slightly past it on a large master bath.
Accessibility conversion for a parent moving in
Walk-in shower with a low curb, blocking in the walls for grab bars later, wider doorway. This is common in Paradise’s 1990s homes where a family is making room for an older relative. Budget from the walk-in shower range up.
No Trip Charge, No Surprise Invoice, and a Written Promise
Three things we do differently that show up in the cost. There’s no trip charge inside the county, so the estimate costs you nothing. We carry premium fixtures and finishes you can look up by name rather than mystery brands off a van. And every bathroom we finish is covered by the 90-Day Done Right Promise – if something isn’t right, one call brings Tom back to fix it, and that’s written on the contract, not buried in fine print.
The standing offers apply here too: $40 off any repair over $200, a free second opinion on any written estimate you’ve already got, and a permanent 10% senior and veteran discount. Our crew members are background-checked and experienced, and our technicians have up to 28 years of experience in this trade.
FAQs
Replacing is almost always cheaper over ten years, even though the repair quote looks smaller up front. A tile overlay typically fails in about four years, which means you pay for two jobs instead of one. The full tear-out with a waterproofed pan lands in the $9,000-$28,000 bathroom remodel range and lasts. Call (855) 596-7029 for an exact quote – estimates are free.
Because so much of the housing here went up in the 1990s and 2000s and the original fiberglass pans are now 20 to 30 years old. That adds a demo, waterproofing, and sometimes subfloor repair line that a national cost guide doesn’t budget for. Adds up to the $9,000-$28,000 range being the honest starting point here.
Yes, we’ll come out and price the job the same day in most cases, and a live person answers the phone 24 hours a day. Call (855) 596-7029 to set it up.
Yes, we pull the plumbing and electrical permits whenever the work touches the rough-in, and the job gets a Clark County inspection. That inspection is what confirms the shower pan liner and GFCI are up to current code. If a contractor tells you permits are optional, get a second opinion – and that second opinion is free.
If you’re ready for a number that holds, call Barrett & Sons Construction Paradise at (855) 596-7029 and we’ll come look at what’s behind the wall before we quote a dollar. Free estimates, upfront pricing, and a scope in writing. Ask anyone on your street, or just look up the license yourself.
Written by the team at Barrett & Sons Construction Paradise, serving Paradise, NV.
What Our Customers Say
"His sons run the crews and they were in our house for four months. Not once did I feel I had to be home to keep an eye on things."
- Camila Fuentes"Beautiful work and honest pricing throughout. The project ran about three weeks past the estimate waiting on the cabinets, which was the supplier rather than him, though the delay was still real."
- Genevieve Ashcombe"Came back a year later to sort a door that had dropped as the frame settled. No charge and no argument about whether it was covered."
- Thaddeus Oyelowo












